Introduction

The concept of the program CBS is explained with overall commands and operations involved.

Master details

Manual entry of Master data , importing of excel data as master data, Defining number of parts, part rebates, Recovery details etc.,

Billing Details

Selection of Items, entry of measurements, steel dia wise entry, secured Advance on Materials, Recovery Management, Copy pasting of Old measurements, creation of Next RA and viewing of Bills etc.,

Statements

Variation statement, Cement, Steel reconcilement, Part rate statements, check Measurement and Sub contractor measurements etc.,

...

Statements part 3

Escalation

Price escalation for Material and Labour as per standard CPWD calculations.

Block Levels and cut fill volume calculations

entry of staff readings chainage wise and getting volume

Site Quality and Daily Registers

Labour, Cement resisters, All quality control test registers like cement, steel, Aggregate, sand, water, chemicals, cubes, Bricks etc., with standard tolerances.
User can select registers with specified number of pages in each register.

Simple Integration with Excel and Autocad

Creating Master DATA from Excel.
Reporting Bill to excel with formula linking, page number cross referencing, page totals with LBD Mbook, Abstract Mbook and RA Bill book (CPWD format).
autocad entity dimension can be captured and pasted to CBS

Bar Bending Schedule

All Steel details can be entered before billing.
Total requirement of steel can be known at project level and member wise.
Steel measurements can be copied to Bill when required.

Additional Options

New features and limits, Options, etc., goes here

Housekeeping operation

Copy to (master DATA) other locations like USB

...

Get from (master DATA) other location like USB

login password can be changed by user

Important Tips are provided here

Backup of Data shall be obtained to safe guard the data.

CPWD style LBD M book, Abstract M book, RA bill Book 

NEW

Extra Items, Substituted Items, Deviated Items, Additional quantity approval, Rate Analysis,Men and Material requirement

Extra Items, Substituted Items, Deviated Items, Additional quantity approval, Rate Analysis, substitution of Market rates, Men and Material requirement including statements, check list, covering letter and approval each item under the deligated powers of competent authority.

Entry of Measurements in Feet Inch in addition to Meters

Measurements can be entered in Feet inch also.

Conversion of unit for meter shall be "MTR" or "RMT"
Square meter shall be "SQM"
Cubic meter shall be "CUM" from Feetinch

Building wise and Floor wise costing for the Billed entries

The Billing measurements for all bills can be assigned with Building identity and Floor identity to sort and get a report to know the cost building wise and floor wise including cement consumption and steel reinforcement reconcilement etc.,

Excel to CBS

Convertion of Multiple column count to single column and copy from excel to CBS.

Many more features are available in CBS, to know all of these please watch all the above videos.